I was wondering if anyone has experienced any traffic delays at 140 GPR. I haven't so far but maybe I'm just going by there during the nonpeak periods. This entire affair seems to have been very overblown. Does anyone know anything about the status of the planned construction?
I wouldnt say anything was overblown at all. If their full allowed complement of attendees comes for each service each Sunday now, its only 20% of what their full-blown plans are so the "observations" of a lack of problems now is by no means representative of what they could be when the facility is if full operation. In addition, I dont think Liarland got the overwhelming support, as far as new members, that he was counting on from the local people, making the whole thing a little ridiculous financially at this point. No one has ever seen more than a few cars there at anytime on Sundays. It must be costing them an absolute fortune just in maintainance. My hope is still that they will realize it as a total folly and fold up and go home. We still dont want them and we dont need them in RT. C.
The one silver lining to high energy costs (ie - electricity and fuel oil) is the fact that it must be destroying Irelands profits. That place has two monsterous boilers to keep the place heated, and the zoning is extremely poor there. And, the electric bill when I worked there was unbelievable. Hopefully, these things will put him and his business in receivership soon.